Electrical distribution from the site substation through the building risers and onward to more than 300 residential connections.

Mains cabling within the Sylvester Street development

13-storey development

More than 300 flats

More than 3,900 metres of mains cabling

The workfront

What the project required.

The challenge

The distribution route extended from the substation through multiple riser cupboards and across every floor of the residential building.

The response

The works were planned as one connected distribution system, combining the substation scope, riser mains, group metering positions and final service connections.

Delivered scope

What TMRF completed.

Outcome

The completed installation provided the electrical distribution route from the substation to the residential connections throughout the building.