A closer look at TMRF electrical work across 33 kV systems, substation fit-outs, LV mains, earthing and building distribution.

33 kV cables terminated at a transformer at Elsecar Road

From the portfolio

Each project tells you what mattered.

The scope, the constraint, the response and the completed work are set out plainly. No generic success story. Just the electrical delivery behind the photograph.

33 kV cables terminated at a transformer at Elsecar Road

33 kV terminations·Rotherham

Elsecar Road

A demanding 33 kV termination package across transformer, field and auxiliary equipment, completed around restricted access at both ends of the circuit.

  • 630 mm² 33 kV cable
  • Transformer and field ends
  • Auxiliary transformer included
Open case study
Completed substation installation and earthing details at Milnhay Road

Substation fit-out·Nottingham

Milnhay Road

Two coordinated substation fit-outs covering cable installation, HV and LV terminations, internal earthing and external earth arrangements.

  • Two substation fit-outs
  • HV and LV cable systems
  • Internal and external earthing
Open case study
Mains cables installed through a high-rise electrical riser at Sylvester Street

High-rise distribution·Sheffield

Sylvester Street

Electrical distribution from the site substation through the building risers and onward to more than 300 residential connections.

  • 13-storey development
  • More than 300 flats
  • More than 3,900 metres of mains cabling
Open case study
Completed cable terminations within a Mastin Moor substation

Complete substation works·Chesterfield

Mastin Moor

Two full substation fit-outs delivered as a tightly coordinated electrical package covering LV, HV, earthing, grating and testing.

  • Two complete fit-outs
  • LV, HV and earthing
  • Testing included
Open case study
Large LV cables terminated within a pillar at Viking Way

Substation and LV pillar·Congleton

Viking Way

A multi-substation package combining large LV cable terminations with HV Euromold work and complete fit-out activity.

  • Three substation fit-outs
  • 300 mm² cables
  • HV Euromold terminations
Open case study
Three mains straight joints completed at Station Road

Live mains jointing·Chester

Station Road

Live mains extension works using side-by-side straight joints, supported by continuity testing when the cable routes were not clearly recorded.

  • Three live straight joints
  • 300 mm² mains cable
  • Continuity testing used
Open case study